Paralink combined with shallow improvement methods.
It is possible to suppress shallow layer improvement strength and prevent cracks! Examples of construction are also introduced with photos.
When the safety factor for sliding of unreinforced fill is Fs < 1.0, it is possible to achieve Fs ≈ 1.0 using shallow improvement methods, and by supplementing the insufficient restraining force with para-links, the strength of the shallow improvement can be controlled, allowing for a reduction in overall costs. Additionally, by laying para-links beneath the shallow improvement body, it is also possible to prevent cracks that may occur in the shallow improvement body. 【Construction Procedure】 ■ Excavation: Improves workability by using slopes (heavy machinery can operate) ■ Installation of reinforcement materials: Also improves trafficability ■ Mixing, spreading, and compacting of improvement materials *For more details, please refer to the PDF materials or feel free to contact us.